Terminal E Section A Garage Repairs
DFW International Airport
As part of the $1.9 billion Terminal Renewal and Improvement Plan for Dallas/Fort Worth International Airport, JQ was contracted to perform inspections and subsequent repair documents for the 1.5 million SF Section A garage at Terminal E. The garage is a four-bay, cast-in-place, post-tensioned concrete structure completed in 1992 and consists of one slab-on-grade level and four elevated levels, with a total of approximately 1,700 parking spaces. Major deficiencies included cracked columns at the first level, severely damaged expansion joint systems, unsealed cracks in the deck surfaces and deteriorated sealants in control joints. The repairs to Section A will extend the useful life of the garage for another 30 years.
Location: DFW Airport, TX
Size: 1,500,000 SF
Services: Facilities Performance