![](http://www.jqeng.com/images/uploads/projects/CONRAC-1_1330-x-500.jpg)
![](http://www.jqeng.com/images/uploads/projects/CONRAC-2_1330-x-500.jpg)
![](http://www.jqeng.com/images/uploads/projects/CONRAC-3_1330-x-500.jpg)
![](http://www.jqeng.com/images/uploads/projects/CONRAC-4_1330-x-500.jpg)
Consolidated Rental Car Facility and Parking Garage (CONRAC)
Austin-Bergstrom International Airport
The five-level Ready/Return/Storage parking facility incorporates all support areas for upkeep, maintenance, preparation and fueling of rental car operations for approximately 1,900 vehicles. This project involved a five-level quick turnaround parking and service facility and an elevated quarter-mile roadway for easy departure from the facility. Entry into the facility is through another elevated roadway via a cast-in-place concrete structure. Vertical circulation for vehicles is provided with two cast-in-place concrete helices and a cast-in-place speed ramp that provides separation between the two facility uses.
Location: Austin, TX
Size: 1,554,760 SF
Services: Structural
Cost: $96M