Consolidated Rental Car Facility and Parking Garage (CONRAC), Austin Bergstrom International Airport

Austin, TX

Services: Structural
Cost: $155M
SF/Floors: 1,150,000/5
Construction Delivery Method: Design-Build
LEED Status: Silver

The five-level Ready/Return/Storage parking facility incorporates all support areas for upkeep, maintenance, preparation and fueling of rental car operations for approximately 1,900 vehicles. Level 6 is designed to accommodate steel framed covered canopy over parking spaces. The project included a five-level Quick Turn-Around parking and service facility and an elevated roadway to allow for easy departure from the facility.