Barbara Jordan Passenger Terminal, Austin-Bergstrom International Airport

Austin, Texas

Services: Structural
Cost: $137 million
SF/Floors: 680,000 SF
Construction Delivery Method: CMAR

A 25-gate airport terminal at the sprawling Austin-Bergstrom International Airport. This project provides new elevated and lowered roadways as well as a five-level terminal with Baggage Claim, operations areas, ticketing and more with a design that celebrates Austin's love of natural aesthetics and native materials. Finishes are in keeping with the dynamic user-friendliness the airport is appreciated for, including touches like stunning native granite and glass with decorative metal panels.