Phase IV-A, B, C and D Pump Station 6 and 6A Improvements, Central Regional Wastewater System

Trinity River Authority

This project consisted of the structural rehabilitation and upgrades to Influent Pump Stations 6 and 6A. The project included modifications to the existing wet well — requiring extensive condition assessment, identification of sources of leaks in the wetwell, repair of moderate to severely corroded concrete surfaces, crack repairs and installation of protective coatings. Other improvements to the pump stations included new screenings equipment and a related screenings material conveyance system, installation of new pumps, replacement of existing discharge headers and design of new buildings for electrical improvements.

Location: Dallas, TX
Services: Structural