Wastewater Treatment Facilities Strategic Plan, Dallas Water Utilities

Dallas, TX

Services: Civil
Cost: NA
SF/Floors: NA
Construction Delivery Method: NA

This study/evaluation included an overall condition assessment of White Rock Influent lift station. JQ developed and assisted the plant with the execution of a pump testing protocol to compare the design rated duty point of the pumps to the current pump curve in order to determine the current operating efficiency. JQ is responsible for completing hydraulic analysis and preliminary pipe sizing and layouts for alternative expansion and treatment schemes being evaluated for both of DWU wastewater treatment plants. Preliminary sizing and layouts of new facilities such as nutrient removal and disinfection were developed. The final report will serve as part of the long range master plan for the Utilitys treatment facilities.