CSC/City Hall Chilled Water Plant

Austin, TX

Services: Structural
Cost: $10M
SF/Floors: 2,000/1
Construction Delivery Method: Design Bid Build

Accommodations for new mechanical equipment and a chilled water plant at the existing Hobby Complex Parking Garage in Austin. The project includes modifications to the lower level and ground level areaway to accommodate new equipment as well as a foundation for the water chilling system. Structural framing and galvanized flooring add two intermediate levels of accessibility to the structure.