Central Utility Plant, TCCD Trinity River East

Fort Worth, TX

Services: Structural
Cost: $6M
SF/Floors: 5,500/2
Construction Delivery Method: CMAR

Tarrant County College District needed to construct a new central utility plant to accommodate its growing East Trinity Campus. JQ provided structural engineering services for the new plant located on the east side of the campus. Design and construction was unique in that it was a two-level facility with one level above grade and the other level below. Constructed as a concrete-framed superstructure, the plant is approximately 5,500 square feet and has an open-air steel roof.